Roads

Release time:

2022-12-01

Share to:


The municipal road network outside Yangling Comprehensive Bonded Zone is smooth, with Yangling Avenue and the high-speed rail station to the east, and the west exit of Xigao Expressway to the west. The roads in the Comprehensive Bonded Zone are designed as 6 horizontal and 5 vertical asphalt concrete roads. At present, the northern half of the three horizontal and five vertical roads in the Comprehensive Bonded Zone has been fully connected. About 4.5 kilometers of asphalt concrete roads have been completed, with an area of 75,000 square meters, which meets the customs logistics and transportation requirements.